Genuinely enjoyed that conversation, Cassie. A team that's gone from $40M to $270M in two years and still wants to be number one is exactly who we do our best work with. Below is what I promised: a sample of the leads our system surfaces, the thinking behind each one, and the few things we need from you to scope this properly for Monday.
Our team does the business development on your behalf, qualifies every lead to your bar, builds the relationship with the decision-maker, and hands your closers a meeting that's ready to win. You just close.
A simplified snapshot, not a call list for your team. These are the raw leads our reps would qualify and book. All biased to merit-shop / right-to-work, your lane, with the two union ones flagged to qualify first.
| Company | Why it's a lead | Decision-maker | Direct mobile | |
|---|---|---|---|---|
| Rosendin Electric | Restructured to chase data-centre/AI growth; says its 5-yr plan hinges on scaling people. Craft is their ceiling, not backlog | John Loukusa VP Field Operations LinkedIn ↗ | jloukusa@rosendin.com | (480) 227-7985 |
| Scout Motors | Publicly held the line on 2027 production vs delay reports; equipment going in, no trades reqs posted yet. We're SC-local | Christian Stehr Director Plant Construction LinkedIn ↗ | christian.stehr@scoutmotors.com | via Jigna (860) 478-3151 |
| QTS Data Centers | Sells rapid deployment to hyperscalers on pre-committed gigawatt campuses. Every date slips on craft | JD Nelson Sr Director Construction LinkedIn ↗ | jd.nelson@qtsdatacenters.com | (817) 371-3460 |
| Faith Technologies | Scaling via modular prefab (Excellerate); new plants in IN, El Paso, Opelika each need 200+ craft to feed the model | Scott Ross Director Workforce Mgmt LinkedIn ↗ | scott.ross@faithtechinc.com | (920) 277-7216 |
| MMR Group | Grew 75% to $2.3B into data centres + semiconductors; new $55M facility. Gated by scarce E&I craft | Jerry Sams Director Ops, Mission-Critical LinkedIn ↗ | jsams@mmrgrp.com | (916) 257-3032 |
| Vantage qualify: union | Building a 1.4GW Texas campus for OpenAI, first building due H2 2026 (target the TX merit build, not WI) | Rob Gire VP Construction, NA LinkedIn ↗ | rgire@vantage-dc.com | (925) 337-3027 |
| Micron qualify: union | 2026 HBM sold out; only risk is fabs online on time, and craft is the bottleneck (target the Idaho merit build) | Shawn Siddoway Sr Dir Workforce Dev LinkedIn ↗ | sssiddoway@micron.com | (208) 995-5083 |
Each has a second decision-maker on file too. Emails Apollo-verified, mobiles and LinkedIn profiles Prospeo-verified. Surfaced 16 June 2026.
The signal says they're hiring. The angle below ties craft labour to the company's own stated goal and deadline, so it's a real reason to be early, not "you're hiring electricians."
These are the inputs that let us write a tight scope and a meeting guarantee that actually means something. Drop them below, or upload the docs, whatever's quickest. You can send what you have now and the rest later.
That's landed with us. I'll build the proposal around your real numbers and bring it to Monday. If you've more to add, just refresh this page and send again, or drop me a line.
I'll get you, me and Anton (our head of sales, who you'll work with day to day) on the 22nd. I'll send the invite in your time, US Eastern, so there's no timezone gymnastics this round. With the four things above in hand, we'll come with the full proposal, the pricing, the meeting guarantee and case studies.
Different sectors to yours, same engine: we surface the signal, qualify to the firm's bar, and hand over booked meetings. Every number below is verified with the client before we publish it.
These three are the clients who've cleared us to share their names and numbers. We also work with other firms — including some larger operations — who'd rather stay unnamed, and whose specific figures we don't publish without their sign-off.